Guided city tours

Hydroelectric Power Plant Hagneck

Hydroelectric power plant, Hagneck
Hydroelectric power plant, Hagneck. © Tourismus Biel Seeland | Stefan Weber
  • Recommended Duration

    • 1 h
    Dauer

The hydropower plant in Hagneck was officially opened in 2015.

Around the power plant in Hagneck much emphasis is placed on the restoration. The fish ladder is unique in Switzerland and the alluvial forest is a nature reserve of national importance. During a guided tour, you will receive insight into the topic of hydropower and learn everything about the renaturalisation measures of the hydropower plants.

Good to know

Good to know
    • On three diverse round tours you gain deep insight on either technical information (2 hours), nature (2 hours) or can opt for a shorter combined tour on both.
    • Registration At least 7 days in advance.

Prices

Prices
  • Prices per Person

    School kids

    • Free
  • Adults

    • CHF 5.-

On site

On site
  • Accessibility

    • Custom hours on request
    • Suitable for families
  • Activities

    • Guided tours
  • Services

    • Suitable for groups
    • Picnic area available
    • WC

Links & PDFs

Links & PDFs

Contact

Contact
Hydroelectric Power Plant Hagneck
Open Google Maps